Project / 03 · Leyland
Mains &
sub-mains
upgrade.
A visual record of electrical upgrade work completed at a Leyland site.
Electrical safety & compliance / Project gallery

Leyland electrical upgrade
Project details
Before & after.
10 images
An inspection for this customer identified that the mains and sub-mains boards were unsafe and non-compliant, with loose connections, unsafe wiring methods, corrosion and poorly protected circuits. Our upgrade delivered a safe installation with consumer units compliant with BS 7671 Wiring Regulations, fully traced and labelled circuits, correctly installed replacement wiring methods, plus surge protection and full RCBO protection throughout the electrical installation.
Before / existing installation
Non-compliant boards.




After / completed installation
Replacement boards.